Skip to main content
Neuropathy Program

Our Approach

Our Neuropathy Protocol in Lakewood Ranch

How we target the cause of nerve damage

Our multi-step neuropathy protocol doesn't mask symptoms with medication. It targets the root cause of nerve damage — restoring blood flow, reducing inflammation, and stimulating nerve repair.

Our methodology

Why our protocol works

Dr. Logan walks through the science behind our multi-step neuropathy protocol and why it produces results where medication alone fails.

The Problem With Conventional Treatment

Why Most Neuropathy Treatments Fail

The conventional approach to neuropathy follows a predictable pattern: diagnose the nerve damage, prescribe gabapentin or a similar medication, and manage the symptoms until they become unmanageable. When the medication stops working, the next step is usually a higher dose or a stronger drug.

This approach fails because it never addresses why the nerves are damaged in the first place. If you want to understand what peripheral neuropathy is, the underlying cause persists — whether it's poor blood supply, chronic inflammation, metabolic dysfunction, or nerve compression — the damage continues to progress regardless of medication.

Our approach is fundamentally different. We start with the cause, not the symptom. See the conditions that respond to our neuropathy protocol and the real patient outcomes from our neuropathy program.

Our Protocol

The Roots Neuropathy Protocol

Step 01

Comprehensive Neuropathy Evaluation

Every patient begins with a thorough evaluation. We assess the severity and extent of your nerve damage through a combination of neurological testing, nerve conduction assessment, and a detailed health history review. We need to know exactly what we’re working with before we build your plan.

Step 02

Identify the Root Cause

Neuropathy is a symptom of an underlying problem — not the problem itself. We investigate what’s driving your nerve damage: metabolic dysfunction, blood flow deficiency, inflammation, spinal nerve compression, or a combination of factors. Addressing only the symptom without the cause is why most approaches fall short.

Step 03

Restore Blood Flow to Damaged Nerves

Damaged nerves need oxygen and nutrients to heal. Our protocol uses advanced therapies to increase microcirculation — blood flow to the smallest blood vessels that supply your peripheral nerves. Without adequate blood supply, nerve repair cannot occur.

Step 04

Stimulate Nerve Regeneration

Using targeted nerve stimulation technology, we activate the body’s natural repair mechanisms. This helps re-educate damaged nerve pathways, reduce pain signaling, and promote the growth of healthy nerve tissue over time.

Step 05

Reduce Inflammation & Support Healing

Chronic inflammation is one of the biggest barriers to nerve recovery. Our protocol includes strategies to reduce systemic inflammation and support the body’s healing environment — creating the conditions under which nerves can begin to repair.

Step 06

Monitor Progress & Adjust

We don’t guess. We measure progress with objective testing throughout your care. This allows us to adjust your protocol based on how your nerves are responding — ensuring you’re always moving in the right direction.

Why The Roots

What Makes Us Different

We Treat the Cause, Not the Symptom

Medication management only masks pain. Our protocol targets the underlying factors driving your nerve damage.

No Surgery, No Addictive Medication

Our entire protocol is non-invasive and does not rely on opioids, gabapentin, or surgical intervention.

Objective Measurement

We use neurological testing to track your progress in real numbers — not just how you feel on a given day.

A Specialist, Not a Generalist

Dr. Logan Swaim has dedicated years specifically to neuropathy care and wrote a book on the subject.

Is This Right For You?

Our Program May Be Right for You If…

  • You’ve been diagnosed with peripheral neuropathy and told nothing can be done
  • You’re taking gabapentin, Lyrica, or other medications that aren’t working
  • Your numbness, tingling, or pain is getting worse over time
  • You’re losing balance or coordination and worried about falls
  • You have diabetes and are developing nerve-related complications
  • You want to explore care options beyond medication management

Inside the care rooms

Precision tools, personal care.

Our neuropathy protocol uses a combination of diagnostic testing, nerve stimulation, and hands-on adjustments. Here's a look inside.
Dr. Logan Swaim consults with an adult patient.

Every case starts with a conversation.

Dr. Logan Swaim delivers a Torque Release adjustment to an adult patient.

Precision adjustments, every visit.

Dr. Logan Swaim performs a focused adjustment at The Roots.

Precision over pressure.

A patient shares their story on camera with Dr. Logan Swaim.

Real stories, real outcomes.

Senior patients smiling together after care at The Roots.

Seniors reclaiming mobility and confidence.

Dr. Logan Swaim presents a nervous-system seminar in Lakewood Ranch.

Monthly nervous-system seminars — teach first, adjust second.

A red light therapy booth inside The Roots Health Centers.

Medical-grade red light — paired with neuropathy care.

The Roots reception desk with Dr. Logan's neuropathy book on display.

Dr. Logan wrote the book on reversing neuropathy.

Keep Exploring

Attend a free seminar

Doctors pictured: Dr. Logan Swaim, MS, DC.

Verified Google Reviews

What Patients Say About This Approach

Real patients, verifiable on Google

I’m enjoying my treatments at roots , I wish I would have found them sooner . They have helped me so much . I have neuropathy and before I started going I could barely walk and was in so much pain. Now after a little over 4 weeks my pain is barely there and walking is so much better! Also getting adjustments from Dr Logan and it’s improved how I feel physically, and has helped my sleep and more. There are so many different areas they can help you in , give them a call I highly recommend them.

Neuropathy Treatment
kimberly L.Google review · 2025

Everyone at Roots is super warm and inviting! There is a calming atmosphere and calming aroma the second you walk in. They are all about educating their patients! I have been going for about 3 months and I am feeling about 90% better! No more nerve pain as well as better sleep. Highly recommend!

Neuropathy Treatment
Sabrina T.Google review · 2025

Nice to get to the root of my foot pain.

Neuropathy Treatment
Kelly W.Google review · 2023

Take the First Step

Attend a free neuropathy seminar or call us to schedule a consultation.